# Deployment for Dynatrace Managed in a fail-over setup at 2 datacenter setup

**URL:** <https://community.dynatrace.com/t/deployment-for-dynatrace-managed-in-a-fail-over-setup-at-2-datacenter-setup/36111>\
**Category:** Dynatrace Managed\
**Tags:** dynatrace-managed\
**Created:** [August 4, 2022, 12:39pm UTC](https://community.dynatrace.com/t/deployment-for-dynatrace-managed-in-a-fail-over-setup-at-2-datacenter-setup/36111 "2022-08-04T12:39:10Z")\
**Posts on this page:** 1\
**Showing post:** 1

<div class="post-metadata">

**Author:** ![EduardLaGrange](https://avatars.discourse-cdn.com/v4/letter/e/958977/32.png) [@EduardLaGrange](https://community.dynatrace.com/u/EduardLaGrange)\
**Post date:** [August 4, 2022, 12:39pm UTC](https://community.dynatrace.com/t/deployment-for-dynatrace-managed-in-a-fail-over-setup-at-2-datacenter-setup/36111/1 "2022-08-04T12:39:10Z")

</div>

Hi I have read the documentation ([https://www.dynatrace.com/support/help/setup-and-configuration/dynatrace-managed/basic-concepts/dynatrace-managed-cluster-failover-mechanism](https://www.dynatrace.com/support/help/setup-and-configuration/dynatrace-managed/basic-concepts/dynatrace-managed-cluster-failover-mechanism)) for standard high-availability setup and I am trying to figure out the best way to provide fail-over for our small cluster deployed over 2 datacenters.

We currently have a 3 node cluster split over 2 datacenters.&nbsp; Presumable if the DC with the single node goes (“DC2”) down we should be OK to continue processing with the 2 nodes in “DC1”.

However if “DC1” goes down we are basically dead - leaving a single node.

Adding another node to “DC2” does not improve the situation from a redundancy perspective.&nbsp; Adding a node in each DC (“DC1” = 3 nodes, “DC2” = 2 nodes) still leaves us vulnerable if “DC1” goes down and also breaks the rule/guidance in the documentation - “If you plan to distribute nodes in separate data centers, you shouldn’t deploy more than two nodes in each data center.”

What are our options here if I want to survive the loss of either “DC1” or “DC2”?&nbsp; Is Premium HA our only option?

---

_[View the full topic](https://community.dynatrace.com/t/deployment-for-dynatrace-managed-in-a-fail-over-setup-at-2-datacenter-setup/36111)._