cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 

what metric should I use to calculate the Exec value [ms] of the PurePAth Tree column of a method?

jose-antonio_ra
Inactive

hello,

i need a measure custom for the exec Total Value. HOw i can do it?

I mean the column of this image

thanks

Jose A


1 REPLY 1

arturomr
Inactive

Hi,

For a concrete method, you can create a measure Exec Time with the method/class. This "Represents the execution time for the declared method."

So, thinking in what you want (there are several methods calls per purepath) you can calculate the times sum per purepath with a Business Transaction. You would put as filter a measure that takes all the purepaths where the method is invoked; and as result the measure Exec Time said before, with sum aggregation. With this, you would sum all the exec times of that concrete method call per purepath.

Hope this helps