Charting based on value

robert_hamilton
Participant

We have a line chart that we would like to set the time range based on values. For example -

Once metric threshold A is reached, the chart range begins and continues until lower threshold B is reached. The range would need to be dynamic, as we would need the chart to read anywhere from 5 hours to multiple days. Is this currently possible?

1 REPLY 1

I'm afraid that's not possible and we don't have plans to introduce something like that. You can, however, select time range on a chart and request this time range to be applied to the whole report.