I have a requeriment, i need to configurate one graphic and from this grafic is necesaria can see if the metric is over a specific threshold and is over threshold it fire one alert, is possible this? is posible do it frome one specific graphic?
You should configure the threshold for the visualization as said by @AntonPineiro and go to the specific entity (service, request…etc) to modify the threshold for the alerting.